Every move is modelled before it is moved.

One chain, eight links, five lenses. Each link carries its own constraints, costs and failure modes; every link is read through all five lenses before a commitment is made, and every finding is issued as a range with the assumption it rests on.

08Links, supplier to site
05Lenses on every link
34Services drawn on
35+Years behind the model

01 — The chain

Eight links. The weakest one prices the move.

Supplier to final site, in the order the cargo meets them. Scroll: each link opens on what is actually checked — and which of the thirty-four services does the checking.

  • Technical
  • Operational
  • Commercial
  • Contractual
  • Risk
  1. Cargo readiness at the gate: packing, marking, dimensions and weights, lifting points, transport drawings and the documentation set — checked against the delivery sequence before a booking exists.

    Cargo readiness & vendor coordination

  2. Axle loads, trailer configuration, turning radii, gradients and bridge capacity from plant to loading berth — with permits, escorts and temporary works identified rather than assumed.

    Transport engineering · route surveys

  3. Draft restrictions, berth characteristics, quay strength, crane availability, storage and heavy-lift capability. Port A against Port B on total landed cost, not port cost alone.

    Port & terminal studies

  4. Vessel suitability, deck loading, stowage concept and lashing philosophy; freight benchmarked against the market, and the charter party read for where liability actually sits before it is signed.

    Chartering · marine & cargo engineering

  5. Heavy-lift capability, Ro-Ro access, tidal and navigational limits, congestion and operational productivity — together with the port, customs and maritime authorities that clear or stall a discharge.

    Port studies · government & stakeholder relations

  6. Import regime, temporary admission, project-specific exemptions, documentation and permits. For Argentina, project-specific analysis of the applicable investment and customs frameworks, including RIGI where it is relevant.

    Customs & regulatory logistics advisory

  7. Bridges, tunnels, overhead lines, power cables, railway crossings, urban restrictions and turning areas — with road modifications, escorts and alternative routes costed before transport is committed.

    Route surveys & road surveys

  8. Lifting concept, crane requirements and lifting plan for the final delivery — the interface where engineering, transport and the site meet, and where the responsibility matrix has to have been written already.

    Heavy lift & oversized cargo · interface management

02 — The lenses

Five questions, asked of every link.

A link that passes four lenses and fails the fifth fails the move. The questions are blunt on purpose:

  • TTechnical — can the piece physically make it: dimensions, weights, lifting points, deck strength, road geometry?
  • OOperational — do the windows line up: tides, weather, berth slots, permits, escorts, site readiness?
  • CCommercial — is the price the market’s or the broker’s, and what does the alternative actually cost?
  • CContractual — where does liability sit at each handover, and who pays for the hour lost?
  • RRisk — what breaks it: country, sanctions, season, market — and what is the fallback worth?

What comes off the desk

  • Feasibility study with corridor options
  • Route & road survey report
  • Transport engineering package
  • Cost & value model, in bands
  • Weather-window analysis
  • Port A vs Port B on landed cost
  • Risk & responsibility matrix
  • Execution plan with KPIs

03 — The cascade

Move one link and you have moved five.

A berth that slips two days reroutes the inland leg, reprices the escorts, burns the weather window and lands inside the EPC contract’s liquidated damages. The model exists to see that before the berth slips.

04 — The engagement

Seven stages, from assessment to improvement.

The chain is the model. The seven stages are how an engagement runs it — the same sequence whether the mandate is one study or a full programme.

  1. 01

    Project assessment

    Business objectives, cargo characteristics, logistics constraints, operational risks and the commercial outcome required.

  2. 02

    Strategic planning

    Logistics strategy, chartering and forwarding approach, procurement alternatives and the execution roadmap.

  3. 03

    Technical evaluation

    Cargo engineering, vessel suitability, port and route capability, operational feasibility.

  4. 04

    Commercial evaluation

    Freight alternatives, total logistics cost, KPI-based supplier evaluation and negotiation support.

  5. 05

    Contract risk review

    Charter parties and logistics agreements, liability and risk allocation, insurance and contractual improvements.

  6. 06

    Execution support

    Monitoring, stakeholder coordination, performance tracking and resolution of operational issues.

  7. 07

    Continuous improvement

    KPI measurement, lessons learned, benchmarking and process improvements for the next operation.

05 — The first reading

A first reading, before any engagement.

Five facts about the cargo are enough to run the chain once. The first reply states which modes are viable, which window the move fits, which permits can be foreseen and an indicative cost band — each with the assumption it rests on.

It shows whether a full study is worth commissioning, and what its first questions will be.

Contact

Put the move on the desk.

Send the cargo, its origin and destination, and the window you are working to. The first reply sets out whether the move is feasible, the likely corridor, the main exposures and an indicative cost band — before anything is committed.