GAOLAN (CN) → CAMPANA (AR)
Axion Energy refinery
- Scope
- Complete refinery
- Volume
- 43,500 CBM
- Delivery
- Yard to site
01 — What is actually being decided
Management receives short, decision-grade reporting rather than operational data. These are the questions it answers every week.
02 — Process
The practice can act as independent adviser or sit inside the project team, reporting to the Project Director, logistics, procurement or contracts.
RFQ, scope, qualified bidders, normalised quotations and weighted evaluation — technical suitability before apparent price.
Packing, marking, dimensions and weights, lifting points, transport drawings and documents checked with each vendor.
Project-specific indicators for cost, schedule, vessel performance, cargo readiness, port productivity and claims.
Deviations logged against the baseline with owner, mitigation and cost.
Rapid diagnosis, alternatives and implementation when delays, damage or contractor failure hit the critical path.
Lessons learned, benchmarking and process improvements carried into the next operation.
03 — Deliverables
04 — Coverage
Scope managed:
Governance tools:
05 — On the record
Operations our team has directed whose cargo and corridor profile match this discipline. Figures as recorded; further project detail on request.
GAOLAN (CN) → CAMPANA (AR)
CHINA → URUGUAY → PARAGUAY
SOUTH AMERICA
06 — Adjacent
Contact
Send the cargo, its origin and destination, and the window you are working to. The first reply sets out whether the move is feasible, the likely corridor, the main exposures and an indicative cost band — before anything is committed.
sz@szandcoadvisory.com London · worldwide