Vessel procurement run as a controlled, auditable process — market sounding to fixture, and through every post-fixture claim — on the client's behalf, with every owner compared on the same documented criteria.

35+Years in chartering & brokerage
13International shipowners represented
1996Dedicated to chartering since
05Lenses applied to every fixture

01 — What is actually being decided

A fixture is a risk position, not a price.

The freight number is the last thing settled and the least of what matters. These are the questions answered before a vessel is nominated — and each one is priced into the outcome whether it was asked or not.

  • 01Which vessel classes can physically take the cargo — and which merely claim to?
  • 02Is this owner's tonnage available in the window, or is the offer speculative?
  • 03Does the freight level reflect the market, or the broker's position in it?
  • 04Where does the charter party place liability for delay, damage and deviation?
  • 05Are the load and discharge ports contractually compatible with the vessel's terms?
  • 06What laytime regime is being accepted, and what does an hour of it cost?
  • 07Which sanctions, flag and class exposures follow the owner rather than the cargo?
  • 08If this fixture fails, what is the replacement market and how long does it take?

02 — Process

Six stages, one auditable trail.

Competition is created deliberately and documented throughout, so every recommendation can be defended after the fact — to a board, an auditor or a tribunal.

  1. 01

    Market sounding

    Reading the real position of tonnage against the project window, before any requirement is disclosed to the market.

  2. 02

    Owner pre-qualification

    Identifying and screening owners and operators on fleet suitability, track record, flag, class and commercial standing.

  3. 03

    RFQ & tender management

    Scope defined in technical terms, issued to a qualified field, with clarification handled on one controlled record.

  4. 04

    Normalisation & benchmarking

    Offers reduced to comparable terms and benchmarked against the market — technical suitability ahead of apparent price.

  5. 05

    Negotiation & fixture

    Charter-party strategy, clause negotiation and fixture support, with the liability position explicit at signature.

  6. 06

    Post-fixture

    NORs, statements of facts, laytime and demurrage tracked as they accrue — not reconstructed once a claim lands.

03 — Deliverables

What the client receives.

  • Market sounding report with tonnage position
  • Owner pre-qualification and screening file
  • RFQ package and scope of carriage
  • Normalised bid comparison
  • Freight benchmark against market
  • Charter-party strategy and clause positions
  • Negotiation record and recommendation
  • Fixture and post-fixture support
  • Laytime and demurrage calculations
  • Claims analysis and contractual basis

04 — Coverage

Tonnage and contract forms.

Vessel classes routinely sourced and evaluated:

Heavy-liftMultipurpose (MPP)Bulk carriers Semi-submersibleDeck carriersRo-Ro TankersOSV / PSV / AHTSDP1 / DP2 AccommodationBarges

Contract forms handled:

Voyage charterTime charterCOA GENCON & BIMCO formsHeavy-lift contracts Offshore contractsBooking notes

05 — On the record

Chartering, applied.

MALAYSIA · PHILIPPINES · VENEZUELA

IMPSA hydropower programme

Projects
Bakun · CBK · Tocoma · Aña Cuá
Marine ops
Semi-submersible
Delivery
Bakun · Tocoma executed in full

FINLAND → CHILE · URUGUAY

Pulp & paper programme

Mills
Arauco · UPM Paso de los Toros · first UPM mill
Scope
Project chartering
Shipments
10

ARGENTINA — ENERGY PROGRAMMES

Offshore oil & gas vessel chartering

Programmes
Total Austral · Magallanes · NK Ph. I
Scope
Pipe · offshore chartering
Tonnage
2,000,000+ t

All chartering operations →

Contact

Put the move on the desk.

Send the cargo, its origin and destination, and the window you are working to. The first reply sets out whether the move is feasible, the likely corridor, the main exposures and an indicative cost band — before anything is committed.

sz@szandcoadvisory.com London · worldwide